We need to find the volume first.
In order to multiply the volume, we need to convert everything.
We could either convert it to feet or inches. We can do feet.
38 feet by 37 feet by 0.5 feet.
We need to then multiply.
38×37=1,406×0.5=703
So the volume of the slab is 703 ft³.
The concrete is $150 per cubic yard.
cubic yard= 27 cubic feet
We can make it $150 per 27 cubic feet.
We need to divide the volume of the slab by 27.
703÷27= 26
Now multiply it by 150.
The cost is $3,906(3,905.56)