Answer:
$35.63
Step-by-step explanation:
The formula for predetermined overhead ate is
= Predetermined fixed overhead rate ÷ Predetermined variable overhead rate
Where;
Predetermined fixed overhead rate = (Fixed overhead cost ÷ Estimated direct labor)
= $1,006,164 ÷ 34,200
= $29.42
But the predetermined variable overhead is $6.21 per machine hour
Therefore, the predetermined overhead rate is
= $29.42 + $6.21
= $35.63