Recently, Job P951 was completed with the following characteristics: Number of units in the job 100 Total direct labor-hours 100 Direct materials $ 800 Direct labor cost $ 10,700 The unit product cost for Job P951 is closest to:

User Vituvo
by
4.4k points

1 Answer

1 vote

Answer:

$2,851

Step-by-step explanation:

The above is an incomplete question. However, a similar question is as seen below

Dehner corporation uses a job order costing system with a single plant wide predetermined overhead rate based on direct labor hours. The company based its predetermined overhead rate for the current year on the following data.

Total direct labor hours 70,000

Total manufacturing fixed overhead cost $273,000

Variable manufacturing overhead per direct labor hour $6.

Given that;

Number of units produced = 100

Direct labor hours = 100

Direct materials = $800

Direct labor cost = $10,700

The unit product cost for jobP951 is

Direct materials = $800

Direct labor cost= $10,700

Variable manufacturing overhead = $6 × 100 = $600

Total fixed manufacturing overhead = $273,000

Total cost = ($800 + $10,700 + $600 + $273,000) = $285,100

Unit product cost = $285,100 ÷ 100

Unit product cost = $2,851