Answer:
Charges current production cost directly to work-in-process inventory
Step-by-step explanation:
The blackflush costing is the costing method in which the present cost of production would be charged to the work in process inventory in a direct way
Therefore as per the given situation the second option is correct
ANd, the rest of the options are wrong as it does not meet the criteria
So the second option would be taken into consideration