Answer:
None of the above is correct.
Step-by-step explanation:
Net Requirement in week 2 = 60
Net Requirement in week 3 = 40
Net Requirement in week 5 = 60
Use two period lot sizing method,
the 1st planned receipt would be = 60+40 = 100 units
None of the above is correct.