It takes 8 hours for 2 men to paint a fence at the same rate hiw long would it take four men​

User SteC
by
5.2k points

2 Answers

2 votes
It should be half of the time since the painters were doubled, therefore 2 hours is the answer.
User Borancar
by
5.2k points
3 votes
It should take 4 hours since 2x2=4 so do the opposite with the time 8/2=4