Answer:
$1.50
Step-by-step explanation:
Predetermined Overhead Rate = Estimated Manufacturing Overhead Cost / Estimated Units of the Allocation Base for the Period
Predetermined Overhead Rate = $1,500,000 / $1,000,000
Predetermined Overhead Rate = $1.50