Answer:
The productivity of the company is $200 per work hour.
Step-by-step explanation:
Productivity can be measured as the ratio of total output to a single input.
Total output in this case would be value of goods produced, which is 10*10^9 dollars.
Single input in this case would be labour measured in hours of work, which is 50*10^6 hr
Productivity of labor would be: 10*10^9 / (50*10^6) = 0.2*10^3 = $200/hr