Answer:
1. The mechanism will require redesign.
2. The main housing mechanism and linkage assembly must be lubricated.
3. there are many replacement parts available.
4. Metal fatigue often results in major system failure.
5. When the diagnostic test is completed without failure then engine can be fired.
6. During session with customer these questions were raised.
7. Repair kit will go with each unit sold.
8. Use the diagnostic system
9. Reason for subsystem failure are many fold
10. when 6 quarts are added the reagent mixture will be more clear.
11. Each unit will be near to 70kg.
12. customer put off by latest trials.
Step-by-step explanation:
13. Strong odor was noticed.
14. Start the procedure
15. These facts indicate that system failure was inevitable.
16. Major actor is speculating on a disaster of tie in.
17. Flexible strap is used for tying together.
18. Vehicle must be able to operate in fast current.
19. Main software system should work together with safety subsystem.