130k views
6 votes
Compute the takt time for a service system that intended to perform a standardized service. The system will have a total work time of 367 minutes per day, excluding three 17-minute breaks, and an hour for lunch. The service system must process 97 jobs a day.

User Kenny
by
5.0k points

1 Answer

1 vote

Answer:

2.64 minutes per cycle

Step-by-step explanation:

Total work time = 367 minutes per day

Break time = 17 min*3 = 51 min

Lunch time = 60 min

Total time left = 367 - 51 - 60 = 256 min

Demand = 97 jobs a day

Takt time = Total production time available/Demand

Takt time = 256 / 97

Takt time = 2.639175257731959

Takt time = 2.64 minutes per cycle

User GayashanK
by
4.3k points