64.1k views
1 vote
A crate is lifted vertically 1.5 m and then heldat rest. The crate has weight 100 N (i.e., it issupported by an upward force of 100 N).How much work was done in lifting thecrate from the ground to its final position?1. More than 150 J2. 150 J3. A bit less than 150 J4. No work was done.5. None of these

User Ady Ngom
by
8.1k points

1 Answer

4 votes

Answer:

option 1

Step-by-step explanation:

given,

Weight of crate = 100 N

Crate is lifted up to height = 1.5 m

Work done =?

work = Force x distance

work = 100 N x 1.5 m

work = 150 J

However, work would be more than the 150 J to lift the crate slightly higher to its final position.

The correct answer is option 1

User Truongnm
by
8.0k points