Answer:
C : $27,000
Step-by-step explanation:
Mainly there are two types of cost i.e variable cost and the fixed cost. The variable cost is that cost which is change when the production level change whereas the fixed cost is that cost which remains constant whether production level changes or not
So, the variable cost includes indirect material, indirect labor, and utilities
And, the fixed cost includes supervision and depreciation expense.
Now the fixed cost would be
= Supervision + depreciation expense
= $22,000 + $5,000
= $27,000