Answer:
The variable factory overhead controllable variance is $2,250 favorable.
Step-by-step explanation:
variable factory overhead controllable variance
= standard variable cost - actual variable cost
= $5500-2.5*3 - $39000
= $2,250 favorable
Therefore, The variable factory overhead controllable variance is $2,250 favorable.