Answer:
a) Process A is the bottleneck of the process
b) Hourly capacity = 60 / bottlenecktime = 60/25 = 2.4 units / hour
Step-by-step explanation:
Part 1 is processed at A for 15 minutes and then at B for 10 minutes.
Thus part 1 take 15 + 10 i.e. 25 minutes two complete both processes
Part 2 is processed at C for 20 minutes.
Output from B and C i.e. part 1 and 2 respectively are fed to process D where the time taken to assemble is 15 minutes
Thus looking at the given data,
Part 1 takes longer time i.e. 25 minutes to reach process C compared to part 2 i.e. 20 minutes
So bottleneck occurs at process A and B because it takes maximum time i.e. 25 minutes
a) Process A is the bottleneck of the process
b) Hourly capacity = 60 / bottlenecktime = 60/25 = 2.4 units / hour