Flores​ Manufacturing, Inc., is moving to kanbans to support its​ electronic-board assembly lines. Determine the size of the kanban for subassemblies and the number of kanbans needed. Setup cost ​$34 Annual holding cost subassembly ​$220 per subassembly Daily production 300 subassemblies Annual usage 55 comma 000 ​(equals50 weekstimes5 days eachtimesdaily usage of 220 ​subassemblies) Lead time 2 days Safety stock one fifth ​day's production of subassemblies The kanban size is nothing ​(round your response to the nearest whole​ number).

User Thoomas
by
8.2k points

1 Answer

6 votes

Answer:

Please see attachment

Step-by-step explanation:

Please see attachment