Answer:
8.934%
Step-by-step explanation:
r(m) = r(f) + [b × r(p)]
r(m) = expected return = 9.975%
r(f) = risk free rate = 2%
b = beta = 1.45
r(p) = risk premium
so,r(p) = (9.975 - 2) ÷ 1.45
= 5.5%
for portfolio,
r(m) = r(f) + (b1 × w1 + b2 × w2) × r(p)
b1 = 1.45, w1 = (5 ÷ 5.5), b2 = 1.25, w2 = (0.5 ÷ 5.5)
r(m) = 2 + [1.45 × (5/5.5) + 1.25 × (0.5/5.5)] + 5.5
= 2 + 1.32 + 0.114 + 5.5
= 8.934%