235k views
2 votes
Mr. Piper's plumbing needed

repairs. The plumber charged
$98 for parts plus $45 per hour
for labor. If the bill totaled $458
how many hours of labor were
required?

2 Answers

0 votes

Answer:

(458-98)รท45 = number of hours required

User Mir Mahfuz
by
6.5k points
2 votes

Answer:

458/143=3.20 so it should be 3.20 hrs

User Wasif Ali
by