___________ assigns a risk rating or score to each information asset. Although this number does not mean anything in absolute terms, it is useful in gauging the relative risk to each vulnerable information asset and facilitates the development of comparative ratings later in the risk control process. Select one: a. BC b. Risk assessment c. DR d. Avoidance

User Gbroekstg
by
5.4k points

1 Answer

6 votes

Answer:

b. Risk assessment

Step-by-step explanation:

Risk assessment -

Risk assessment is used to describe the following -

1. Identification of hazard i.e. , Determine the risk and hazard , which can cause any harm

2. Risk analysis and evaluation i.e. , To analyse and evaluate the risk associated with a hazard .

3. Risk control i.e. , To find the ways to avoid or remove the hazard

Hence , from the question , the correct term according to the question is b. Risk assessment .