3.6k views
0 votes
Girardo is using the model below to solve the equation

Girardo uses the following steps:

Step 1 Add 4 negative x-tiles to both sides
Step 2 Add 1 negative unit tile to both sides
Step 3 The solution is

Which step could be adjusted so that Gerardo's final step results in a positive x-value?
In step 1, he should have added 4 positive x-tiles to both sides.
In step 1, he should have added 3 negative x-tiles to both sides.
In step 2, he should have added 4 negative unit tiles to both sides.
In step 2, he should have added 1 positive unit tile to both sides.

Girardo is using the model below to solve the equation Girardo uses the following-example-1
Girardo is using the model below to solve the equation Girardo uses the following-example-1
Girardo is using the model below to solve the equation Girardo uses the following-example-2

2 Answers

5 votes

Answer:

The answer is B. In step one he should have added 3 negative x-tiles to both sides.

Explanation:

ITS B I GOT 100% ON THIS ASSIGNMENT

User Strick
by
5.2k points
2 votes
The answer is B. In step one he should have added 3 negative x-tiles to both sides.
User Dariom
by
4.7k points