Answer:
Manufacturing overhead cost estimates for this special-order is $63,000
Step-by-step explanation:
The computation of the manufacturing overhead is shown below:
= Actual direct labor-hours × predetermined or estimated overhead rate
= 700 direct labor hours × $90
= $63,000
It shows a relationship between the estimated overhead rate and the actual direct labor hours
For better understanding, we provided the formula to compute the estimated manufacturing overhead rate.
Predetermined overhead rate = (Total estimated manufacturing overhead) ÷ (estimated direct labor-hours)