56.1k views
3 votes
The first gardener can finish the job in 6 hours, and the second gardener can do the same job in 7 hours. How long it will take them to finish the same job, if they work together?

User Riku
by
5.4k points

2 Answers

1 vote

Answer:

3 and 7/30 hours

User Inikulin
by
5.6k points
4 votes

If the first gardener can finish the job in 6 hours, it means that every hour he completes 1/6 of the job.

By the same logic, the second gardener completes 1/7 of the job per hour.

So, if they work together, they complete


(1)/(6)+(1)/(7)=(7+6)/(42)=(13)/(42)

of the job per hour.

So, after 42/13 of a hour, they'll complete the job. Since one hour is made of 60 minutes, 42/13 of a hour is


(42)/(13)\cdot 60 \approx 194

So, it will take them about 194 minutes to finish the job, i.e. about 3 hours and 14 minutes.

User Shodanex
by
5.2k points