Answer:
1) Yes
2) Overhead Job W= $3,000
Step-by-step explanation:
Giving the following information:
Sigma Corporation applies overhead costs to jobs based on direct labor cost.
Job V:
Direct material= $5,000
Direct labor= $8,000
Overhead= $6,000
Job W:
DM= $2,500
DL= $4,000
Overhead rate= 6000/8000= $0.75 per DL $
Overhead Job W= 0.75* 4000= $3000