Answer:
The correct answer is option d.
Step-by-step explanation:
The estimated overhead cost is $380,000.
The estimated direct labor hours are 55,000.
The estimated machine hours is 25,000.
The actual overhead cost incurred is $350,150.
The actual labor hour is 56,000.
The actual machine hours is 26,000.
The predetermined or estimated overhead rate per machine hour
=

=

= $15.2