Answer:
The answer is: $10.00
Step-by-step explanation:
To calculate the predetermined manufacturing overhead rate per direct labor hour we must divide the total estimated overhead cost by the total estimated direct labor hours.- $250,000 / 25,000 DLH = $10.00 per DLH.
Instead if we wanted to calculate the real MOH we should divide the real total overhead cost ($275,000) by the real total direct labor hours (28,000) = $9.82