Answer:
Predetermined overhead rate= $40.38 per machine hour
Step-by-step explanation:
Giving the following information:
Arabica Manufacturing uses a predetermined overhead allocation rate based on the number of machine hours.
At the beginning of the year, it estimated:
Total manufacturing overhead costs to be $1,050,000.
Total number of direct labor hours to be 5,000.
Total number of machine hours to be 26,000 hours.
Predetermined overhead rate= total estimated overhead for the period/ total amount of allocation base
Predetermined overhead rate= 1050000/26000= $40.38 per machine hour