Under a construction management (CM) contract, should the CM firm's responsibilities normally begin at the construction phase, the design phase, the planning phase, or the conceptual phase?

User Turtaru
by
8.0k points

1 Answer

6 votes

Answer:

Conceptual or planning design phase.

Step-by-step explanation:

Construction management have following phases

Phase 1 :Conceptual or planning design phase.

Phase 2 : Engineering and design phase.

Phase 3 :Procurement phase.

Phase 4 :Execution phase.

Phase 5 :Operation and maintenance phase.

These all phases running in a proper sequence .So at the begging of construction the first phase is conceptual or planning phase.