Answer:
Slope = 32 Slope indicates the variable cost per unit.
Explanation:
As we know that
Total cost is the summation pf fixed cost and variable cost.
Lets take fixed cost =F
Variable cost V=x v
v is the variable cost per unit.
Total cost = F+ V
TC= F + x v
The slope of total cost line is variable cost per unit.
Given that
C= 32x + 560
So from above we can say that
F= 560
V= 32 x
Slope = 32 Slope indicates the variable cost per unit.