199k views
4 votes
In which of the following scenarios is the greatest amount of work accomplished?

A crane lifts a boulder weighing 300 N to a height of 4.0 meters.
A crane lifts a boulder weighing 400 N to a height of 2.0 meters.
A crane lifts a boulder weighing 200 N to a height of 8.0 meters.
A crane lifts a boulder weighing 250 N to a height of 6.0 meters.

1 Answer

3 votes

Answer:

Step-by-step explanation:

The answre is C.A crane lifts a boulder weighing 200 N to a height of 8.0 meters.

User Manas Saxena
by
5.5k points