Answer:
Instructions are listed below
Step-by-step explanation:
Giving the following information:
Estimates:
Direct labor-hours required to support estimated output 18,000.
Fixed overhead costs $ 198,000.
Variable overhead cost per direct labor-hour $ 1.00
A) overhead rate= (fixed + variable cost)/direct labor hour
Overhead rate= (198000 + 1*18000)/18000= 12
B) Direct materials $ 719
Direct labor cost $ 177
Direct labor-hours used 7
Manufacturing overhead= $1* 7= $7