103k views
3 votes
You have just determined the actual number of workstations that will be used on an assembly line to be 8 using the assembly-line balancing procedure. The cycle time of the line is 10 minutes, and the sum of all that tasks required on the line is 60 minutes. Which of the following is the correct value for the resulting line's efficiency? A. 0.500B. 0.650C.0.750D. 0.850E. None of these

1 Answer

1 vote

Answer:

Efficiency will be 0.75 so option (c) will be correct option

Step-by-step explanation:

We have given Total time for all task = 60 minutes

Actual Number of workstations = 8

Cycle time = 10 minutes

Efficiency is given by


Efficiency(\eta ) =(total\ time\ for\ all\ task)/(number\ of\ work\ station* cycles\ time)=(60)/(8* 10)=0.75

So option (c) will be the correct option

User Lynncasiano
by
5.0k points