Answer:
job N° 1376 manufacturng overhead 2,560
Step-by-step explanation:
For this company, the overhead is calculate based on direct labors.
It will be calculated by multiplying the cost driver by the overhead rate:
overhead rate x direct labor hours of job:
14.00 x 160 = 2,560
6,400 will be the allocate overhead for job N° 1376
This will latter be compare with the actual overhead to check for underapplied or overapplied overhead and adjust hte difference.