Answer:
The overhead is over allocated by $1000.
Explanation:
The manufacturing overhead is applied based on machine hours, the predetermined allocation rate is $3 per machine hour.
Actual machine hours were 3,000 making the cost as =
dollars
But the actual manufacturing overhead was $8,000.
So, the overhead is over allocated by =
dollars
Therefore, the answer is over allocated by $1000.