To maintain balance in a project with a fixed budget and a well-defined scope, a project team will require flexibility ____________. a. with the deadline b. in spending c. with project quality d. with assumed risks e. in achieving the goals of the business case

User Johnsonium
by
5.4k points

1 Answer

3 votes

Answer:

a. with the deadline

Step-by-step explanation:

When a project has a fixed budget, it cannot move its expenditure as that shall be fixed, for fixed as well as variable cost, in total no increase in expenditure.

In no terms the project will be successful if it does not meet the quality, thus the quality standards shall not be adjusted.

The risks associated with the project can not be altered.

The goals of business shall not be altered for small projects as generally the goals are long term in nature.

Therefore, correct option is

a. with the deadline

As the deadline can be altered or revised a little to meet the expectations.