222k views
4 votes
Cables and conductors installed on the side of a pole or building shall be protected up to ___feet above finished grade.

User Mojuba
by
7.2k points

1 Answer

2 votes

Answer:

10 feet.

Step-by-step explanation:

Conductors are considered outside the building when they installed. The requirement of NEC is above 10 feet for the clearance after the final grade for service conductors and cables where they are connected with the building, above the sidewalks and the to other areas which are accessible to the pedestrians.

User JoGr
by
6.9k points