141k views
3 votes
Toni makes apple pies for the local bakery. When Toni works with an assistant, she produces 60% more apple pies and works 20% fewer hours. Having an assistant increases Toni’s output of apple pies per hour by what percent?

2 Answers

4 votes

Answer: η = 200 %

Step-by-step explanation:

When Toni bakes alone, we have this: Toni bakes n apple pies in a time frame of t

This is mathematiclly expressed as:

output = produce/time

produce = n, time = t

output 1 = n/t -------------------- Eqn 1

When Toni bakes with an assistant, we have this: Toni bakes 60% more apple pies in a time frame shorter by 20%

This is mathematiclly expressed as:

produce = n + 0.6 n = 1.6 n, time = t - 0.2 t = 0.8 t

output 2 = 1.6 n/0.8 t --------------- Eqn 2

η = 100% x output 2/output 1

η = 100% x
(1.6 n)/(0.8 t)/(
(n)/(t) \\)

η = 200 %

User Dmitriy Lezhnev
by
5.2k points
4 votes

Answer:

200 % is the answer.

Step-by-step explanation:

Toni makes x be apple pies .

and Jane works for y hours.

therefore, he makes x apple pies in y hours

which implies he makes
(x)/(y) apple pies per hour

Now with help of an assistant:

Toni makes 60% more apple pies i.e. x + 0.6x = 1.6x apple pies

works 20% less i.e. y - 0.2y = 0.8y hours

therefore, now together they make 1.6x/0.8y apple pies per hour
((1.6x)/(0.8y) )/((x)/(y) ) X 100

simplifying we get

200

Hence % increase in output PER HOUR is 200.

User Pathoschild
by
5.6k points