Answer:
Option C is correct
Step-by-step explanation:
Given,
The maximum capacity of the plant when it is operating at
% (i.e without any breakdown)efficiency is equal to
tons of product per day.
However, the plant can produce
tons of product per day with constraints.
So, the capacity of the plant is given by actual production with constraint divided by maximum production without any constraints.
This is equal to
%
Hence, option C is correct