The tool crib at a large manufacturing company is responsible for providing tools to the factory workers on demand. The tool crib has a variable demand.​ Historically, its demand has ranged from 320 to 570 small tools per day with an average of 445. Diane, the tool crib​ attendant, works eight hours a​ day, five days a week. Each order is for one small tool and each small tool takes Diane 1 minute to retrieve from the bins.

What is the average waiting​ time, in​ minutes?

6.4, 5.4, 7.4, 1?

1 Answer

6 votes

Answer:

6.4 minutes

Step-by-step explanation:

Average small tool per day = 445

working hours = 8 so that is 8*60 = (480 minutes)

Waiting time =


([445*(√(1) )])/([2*[480-(445*1)]]) (image of the operation on the attach file)

=[445]/[(2*35)]

=445/70

=6.357 minutes