66.9k views
5 votes
A pump started filling an empty pool with water and continued at a constant rate until the pool was full. At noon the pool was 1/3 full, and 114114 hours later it was 3/4 full. What was the total number of hours that it took the pump to fill the pool?A. 213213B. 223223C. 3D. 312312E. 323

User Thurston
by
4.5k points

1 Answer

4 votes

Answer:

The correct option is C.

Explanation:

It is given that at noon the pool was 1/3 full and
1(1)/(4) hours later it was 3/4 full.

Total parts of pool filled in
1(1)/(4) hours is


(3)/(4)-(1)/(3)=(9-4)/(12)=(5)/(12)

The time can be written as


1(1)/(4)=(5)/(4)

It means
(5)/(12)th part of the pool is filled in
(5)/(4) hours.

Let the pool is filled completely in x hours. So
(5)/(12)th part of the pool is filled is
(5x)/(12).


(5x)/(12)=(5)/(4)

Multiply both sides by 12.


5x=15

Divide both sides by 5.


x=3

The pool is completely filled in 3 hours. Therefore the correct option is C.

User Prashan
by
4.8k points