Answer:
The amount of work is 89600 ft-lb.
Step-by-step explanation:
Given that:
Length of the cable = 160 ft
Weight density = 7 lb/ft
Weight of cable to be filled = 7(160-y)
We need to calculate the amount of work
Using formula of work done:

Hence, The amount of work is 89,600 ft-lb.