A continuity plan would be implemented ________.

during a scheduled system backup

after a large-scale power failure

after a period of low staffing

during a period of high census

1 Answer

6 votes

Answer:

during a scheduled system backup

Step-by-step explanation:

A continuity plan would be implemented during a scheduled system backup .