Answer:
45 minutes each
Explanation:
Set Plan A clients as x and Plan B clients as y to make a system of equations, the constant is the number of hours worked.
3x+5y=6
9x+7y=12
Now solve using substitution or elimination. I will use elimination.
-9x-15y=-18 I multiplied the whole first equation by -3 to eliminate x.
9x+7y=12, add the equations
-8y=-6 solve for y
y= 3/4 of an hour or 45 minutes
Next plug y into either equation
3x+5(3/4)=6 Solve for x.
3x+15/4=6
3x=2.25
x=0.75, also 45 minutes
To check plug in each variable value to each equation to see if they work if you need to.