152k views
5 votes
Match each of the definitions that follow with the term it defines.

Engineering change order Total cost concept
Variable cost concept Normal selling price
Setup A document that initiates a product or process change
Includes manufacturing costs plus selling and administrative expenses Changing tooling when preparing for a new product
Target selling price to be achieved in the long term Variable manufacturing costs plus variable selling and administrative costs are included in cost per unit

User Bimasakti
by
7.1k points

1 Answer

2 votes

Answer: The answers are:

1) Engieering change order is a document that initiates a product or process change.

2) Total cost concept Includes manufacturing costs plus selling and administrative expenses.

3) Variable cost concept = Variable manufacturing costs plus variable selling and administrative costs are included in cost per unit .

4) Normal selling price is Target selling price to be achieved in the long term .

5) Setup = Changing tooling when preparing for a new product.

User Brett Sutton
by
7.5k points