Answer:
Cutting 36 per Labor Hour
Stitching 25 per machine hour
Inspections 17.5 per labor hour
Packing 12.5 per finished good
Step-by-step explanation:
cost/ cost driver = rate
Cutting Cost 900,000 / 25,000 labor hours = 36 Rate/DLH
Stitching Cost 8,000,000 / 320,000 machine hours = 25 rate/MH
Inspections Cost 2,800,000 / 160,000 labour hours = 17.5 rate/ DLH
Packing Cost 800,000 / 64,000 finished goods = 12.5 rate/FG