Answer:
Explained
Explanation:
Cold working: It is plastic deformation of material at temperature below recrystallization temperature. whereas hot working is deforming material above the recrystallization temperature.
Given melting point temp of lead is 327° C and lead recrystallizes at about
0.3 to 0.5 times melting temperature which will be higher that 20°C. Hence we can conclude that at 20°C lead will under go cold working only.