173k views
2 votes
The cost accountant for Kenner Beverage Co. estimated that total factory overhead cost for the Blending Department for the coming fiscal year beginning May 1 would be $140,000, and total direct labor costs would be $100,000. During May, the actual direct labor cost totaled $13,500, and factory overhead cost incurred totaled $19,200. Required: What is the predetermined factory overhead rate based on direct labor cost?

User Cajuuh
by
8.0k points

1 Answer

5 votes

Answer:

The 140% is the predetermined factory overhead rate based on direct labor cost.

Step-by-step explanation:

The given information is shown below:

Total factory overhead cost - $140,000

Total direct labor costs - $100,000

Actual direct labor cost - $13,500

Factory overhead cost - $19,200

By using these information, it is easy to compute predetermined factory overhead rate which is based on direct labor cost. The formula is shown below:

= Total factory overhead cost ÷ Total factory overhead cost

= ($140,000 ÷ $100,000) × 100

= 1.4 × 100

= 140%

Other cost is irrelevant and thus not be considered while computing predetermined factory overhead rate.

Hence, the 140% is the predetermined factory overhead rate based on direct labor cost.

User Lacobus
by
8.4k points

Related questions

asked Apr 26, 2024 73.3k views
Rajat Verma asked Apr 26, 2024
by Rajat Verma
7.8k points
2 answers
2 votes
73.3k views
asked Dec 14, 2024 55.4k views
Michael La Voie asked Dec 14, 2024
by Michael La Voie
8.2k points
2 answers
2 votes
55.4k views