Answer:
The total work done is zero.
Step-by-step explanation:
Given;
mass of the crate, m = 70.0 kg
height above ground through which the crate is lifted, h = 12.0 m
The only work associated in lifting and lowering this crate is gravitational potential energy.
Potential Energy during lifting = - mgh
= - 70 x 9.8 x 12
= - 8232 J
Potential Energy during lowering = mgh
= 70 x 9.8 x 12
= 8232 J
Total total work done by the force = - 8232 J + 8232 J = 0
Therefore, the total work done is zero.