A pharmaceutical company wants to test the efficiency of its new drug production techniques so they run 3 shifts of production for 4 hours each and collect the product at the end of each shift. Their chemical engineers predict a maximum of 7000 grams of product can be created each shift.

Shift one produces 4562 grams.
Shift two produces 5783 grams.
Shift three produces 5247 grams.

What is the average percent yield for this new production technique?
A. 82.61%
B. 51.97%
C. 74.25%
D. 74.95%

User Lindsay
by
2.9k points

2 Answers

16 votes
16 votes

Answer:

C.) 74.25%

Step-by-step explanation:

I got it correct on founders edtell

User Anton Zuenko
by
3.1k points
24 votes
24 votes

Answer:

c

Step-by-step explanation:

total production of the three shifts/ total of prediction of each yield x 100%