Answer:
The answer is "1,100,000".
Step-by-step explanation:
A sunk cost refers to a cost that has just been incurred and in the given scenario, the original cost that is the carrying value and that cost is sunk cost. Remember that sunk cost is different from future cost.
Thus 1,100,000 is the sunk cost in this situation.