Answer:
3.75 meters
Explanation:
We need to work backwards.
We know that each length is half of the one prior (if we work from the longest to shortest)
So if the longest is 2 meters
The next would be 1 meter
The next would be .5
the last would be .25
The rope was 3.75 meters