Answer:
first you find the total area by multiplying 24*16
you have to cover a total of 384 meters
then you find out how many cm in a meter there is 100 cm in a meter
there will be 2.5 slabs per meter
you multiply 2.5 * 384
you will need 960 slabs
Explanation: